Calendar module icon

Calendar

View All Calendars is the default. Choose Select a Calendar to view a specific calendar. Subscribe to calendar notifications by clicking on the Notify Me® button, and you will automatically be alerted about the latest events in our community.

Jump To:

  1. Calendar Overlay Engineering & Public Works (7)
  2. Calendar Overlay Zoo (1)

Engineering & Public Works

  1. Lane Restrictions-US 52 South between Teal Rd & CR 775 E also Teal Rd from 30th St to US 52 S.

    April 2, 2018, 6:00 AM - September 8, 2018, 6:00 PM

    Rieth-Riley will be having numerous lane restrictions and closures throughout the project. Lane restrictions and closures will begin on Teal Rd. from S. 30th St. to US 52 S. They will continue at the intersection of Teal Rd. and US 52 S. heading South to the end of the project at CR 775 E. Contractor will be sending in updates throughout the project so that any modifications can be added to the road closure request, keeping it current. Traffic control will be in place at all times. Watch for flagmen, signage, barricades and barrels. Restrictions and closures will be from 4/2/18 to 9/8/18. Contact: Jeff Bond with Rieth-Riley 765-585-7758.

    More Details
  2. Road Closures on 10th St & Valley St. between South & Kossuth St. 4/30 - end of Nov.

    April 30, 2018, 6:00 AM - November 30, 2018, 6:00 PM

    Bowen Engineering will be closing the section of 10th St. & Valley St. spanning from South St. to Kossuth St. for the installation of a water main and storm water work. Road Closure will be from 4/30/18 to 11/30/18, approximately 6 months.Through traffic will not be permitted during this time. If you are traveling through this area, please follow the alternate route, which will be displayed by detour markers. Please be attentive as construction traffic and workers will be in and around the work zone. Contractor has coordinated with the residents, flaggers will help facilitate everybody to and from their residence during this time. Contact: Scott Heinzelman with Bowen Engineering at 317-719-2767.

    More Details
  3. Lane Shifts/Lane Restrictions on S. 4th St from Romig to Montifiore St 7/27 to 10/5 for curb/ramp replacement

    July 27, 2018, 8:00 AM - October 5, 2018, 5:00 PM

    Dixon Construction will have Lane Shifts and Lane Restrictions on S. 4th Street between Romig Street and Montifiore Street from 7/27/18 to 10/5/18 for curb and ramp replacement. Watch for signage, barrels. Contact: Tom Dixon 765-409-3489 or 765-426-3501

    More Details
  4. Temporary Alley and Sidewalk Closures Btwn Main & Columbia for Lahr Aparment Exterior Painting

    August 13, 2018 - September 14, 2018

    There will be periodic alley and sidewalk closures between Main and Columbia for painting at the Lahr Aparments. No work will be done during special events such as the Farmers Market, Mosey Down Main St., and Outfest. All sidewalks, alleys, and parking will be open during downtown events. The periodic closures will be for the remaining of August through mid September. For questions please contact Brian Cook (Renovia) at 317-407-1177 or bcook@renovia.com.

    More Details
  5. Traffic pattern change on US 52 beginning 8/31/18 between CR 400 S & CR 800 S

    August 31, 2018, 7:00 AM - October 31, 2018, 5:00 PM

    Rieth-Riley will be changing the traffic pattern on US 52 from 8/31/18 to 10/31/18. Moving Eastbound lane into the original drive lane. Westbound driving lane will be moving through the crossovers into the Eastbound passing lane while maintaining two-way traffic. This change will take place between CR 400 S. and CR 800 S. Contact: J. R. Beaman 765-404-4750

    More Details
  6. Road Closures for the GermanFest on North St., 8th St., Ferry St. & 9th St. 9/6 to 9/8

    September 6, 2018, 7:00 AM - September 8, 2018, 12:00 PM

    St. Boniface Annual GermanFest will have the following Road Closures; North St. between 9th and 8th Streets 9/6/18 at 7 AM, re-open 9/8/18 @ Midnight. 8th St. between Ferry and North Streets 9/6/18 at 7 AM, re-open 9/8/18 @ Midnight. 8th St. between Ferry and Main Streets 9/8/18 @ 7 AM, re-open 9/8/18 @ Midnight. Ferry St. between 9th and 8th Streets 9/7/18 @ 7 AM, re-open 9/8/18 @ Midnight. 9th Street between Ferry and Brown Streets 9/8/18 @ 3 PM, re-open 9/8/18 @ Midnight. Contact: Sheila Cochran 765-426-0624.

    More Details
  7. Lane Restrictions @ N. 19th St., Elliot St. & Beech Rd. 9/7 to 9/14 for milling & paving

    September 7, 2018, 7:00 AM - September 14, 2018, 5:00 PM

    Rieth-Riley will have Lane Restrictions on the following streets for milling and paving work. N. 19th Street from Greenbush Street to Underwood Street. Elliot Street from 9th Street to 11th Street. Beech Road from Sagamore Pkwy. to Hemlock Rd. This will be from 9/7/18 to 9/14/18. Watch for flaggers. Contact: Don Baker 989-842-0220.

    More Details

Zoo

  1. Zoo Pajama Party

    September 7, 2018, 6:30 PM - 7:30 PM @ Bill and Donna DeFouw Education Center

    Grab your favorite stuffed animal and head on over to the Zoo for a Pajama Party! Each session includes a sing-a-long and dance session, an encounter with one of the Zoo’s friendliest Animal Ambassadors, a bedtime story and a snack. Fun for the whole family! Zoo Pajama Party is designed for families with children ages 0-5+.

    More Details