-
October 4, 2018, 7:00 AM - April 20, 2020, 5:00 PM
Sidewalk Closed East side 5th between Columbia & South & North side of South from 5th to alley2018-10-04T07:00:00Star City Crossing will have the sidewalk closed on the East side of 5th Street between South Street and Columbia Street, sidewalk will also be closed on the North side of South Street between 5th Street and the Alley just West of City Hall for the construction of a new building. This will be from 10/4/18 to 4/30/20. Chain link fence has been placed around site. Contact: Jon Caron 765-414-3995
Event LocationLafayetteIN47901 Star City Crossing will have the sidewalk closed on the East side of 5th Street between South Street and Columbia Street, sidewalk will also be closed on the North side of South Street between 5th Street and the Alley just West of City Hall for the construction of a new building. This will be from 10/4/18 to 4/30/20. Chain link fence has been placed around site. Contact: Jon Caron 765-414-3995
More Details
-
April 4, 2019, 7:00 AM - December 30, 2019, 5:00 PM
Walking trail closure & construction of new drives @ CR 430 S & S. 18th St 4/4 to 12/302019-04-04T07:00:00Kettlehut Construction will be installing temporary construction drives and eventually the installation of permanent new drives for TCPL South Branch Library. Closure locations approx. 50' of walking trail North of CR 430 S to the West of roundabout at intersection with S. 18th Street. Approx. 66' of walking trail on the West side of S. 18th Street to the North of roundabout at intersection with CR 430 S. from 4/4/19 to 12/30/19. Closures will be at construction drives for new South Branch Library. Existing walking trail will be removed and stone construction drive utilized until permanent drive paving and new concrete sidewalk can be installed late summer or early fall. Construction fencing and signage will be posted to alert general public of walking trail closures. Contact: Nate Secrest 765-447-2181
Event LocationLafayetteIN47901 Kettlehut Construction will be installing temporary construction drives and eventually the installation of permanent new drives for TCPL South Branch Library. Closure locations approx. 50' of walking trail North of CR 430 S to the West of roundabout at intersection with S. 18th Street. Approx. 66' of walking trail on the West side of S. 18th Street to the North of roundabout at intersection with CR 430 S. from 4/4/19 to 12/30/19. Closures will be at construction drives for new South Branch Library. Existing walking trail will be removed and stone construction drive utilized until permanent drive paving and new concrete sidewalk can be installed late summer or early fall. Construction fencing and signage will be posted to alert general public of walking trail closures. Contact: Nate Secrest 765-447-2181
More Details
-
June 13, 2019, 3:00 PM - December 31, 2019, 5:00 PM
Sidewalk & South St Closed Indefinitely between Main St & 18th Street2019-06-13T15:00:00Sidewalk and South Street between Main Street and 18th Street has been closed Indefinitely. Contact: Mark Gick 765-807-1050
Event LocationLafayetteIN47901 Sidewalk and South Street between Main Street and 18th Street has been closed Indefinitely. Contact: Mark Gick 765-807-1050
More Details
-
July 23, 2019, 7:00 AM - December 31, 2019, 5:00 PM
Road Closure on Hartford Street from 14th to 15th St 7/23 to 12/31 for Demo2019-07-23T07:00:00Denney Excavating will have Hartford Street closed between 14th Street and 15th Street for the demolition of St. Francis Lafayette Hospital West and North wings and the St. Elizabeth Nursing School. Watch for road closed and detour signage. Contact: Suzanne Borges 317-554-2812
Event LocationLafayetteIN47901 Denney Excavating will have Hartford Street closed between 14th Street and 15th Street for the demolition of St. Francis Lafayette Hospital West and North wings and the St. Elizabeth Nursing School. Watch for road closed and detour signage. Contact: Suzanne Borges 317-554-2812
More Details
-
July 27, 2019, 7:00 AM - November 7, 2019, 5:00 PM
UPDATE: (Northbound 4th Street temporarily closed at Teal Road Intersection - Expect closure to last 2 weeks) Lane Closure Northbound lane of 4th St from 1850 S. 4th St to Club Ln intersection 7/27-11/72019-07-27T07:00:00UPDATE: Northbound lane of 4th Street will be temporarily closed from Teal Road to Club Lane. Please follow the traffic signs and detours to access businesses in this area. The northbound lane of 4th St. will re-open to 1850 S 4th Street once the work in this area is complete.
Atlas Excavating will have the Northbound lane of 4th Street from 1850 S. 4th Street to Club Lane Closed 7/27/19 to 11/7/19 for water main replacement work. Watch for detour, road closed signage. Watch for heavy equipment. Contact: Bret Dierdorf 765-637-9124
Event LocationLafayetteIN47901 UPDATE: Northbound lane of 4th Street will be temporarily closed from Teal Road to Club Lane. Please follow the traffic signs and detours to access businesses in this area. The northbound lane of 4th St. will re-open to 1850 S 4th Street once the work in this area is complete.
Atlas Excavating will have the Northbound lane of 4th Street from 1850 S. 4th Street to Club Lane Closed 7/27/19 to 11/7/19 for water main replacement work. Watch for detour, road closed signage. Watch for heavy equipment. Contact: Bret Dierdorf 765-637-9124
More Details
-
August 13, 2019, 8:00 AM - November 15, 2019, 5:00 PM
Road Restrictions on Underwood St. between 15th St & Erie St 8/13 - 11/152019-08-13T08:00:00Heartland Excavating will have Road Restrictions along Underwood Street between 15th Street and Erie Street working on concrete curb and gutter, drive approach and handicap ramp replacement. This will be 8/13/19 to 11/15/19. Watch for barrels and construction ahead signs. Contact: Mike Weathers 765-714-7686
Event LocationLafayetteIN47901 Heartland Excavating will have Road Restrictions along Underwood Street between 15th Street and Erie Street working on concrete curb and gutter, drive approach and handicap ramp replacement. This will be 8/13/19 to 11/15/19. Watch for barrels and construction ahead signs. Contact: Mike Weathers 765-714-7686
More Details
-
August 15, 2019, 7:00 AM - November 30, 2020, 5:00 PM
Sidewalk Closure 8/15/19 - 11/30/20 @ Loeb Stadium East side of Main St. & North side of Wallace2019-08-15T07:00:00J. R. Kelly Co. will have the following sidewalk closure at Loeb Stadium from 8/15/19 through 11/30/20. The sidewalks on the East side of Main Street and the North Side of Wallace Avenue will be closed adjacent to Loeb stadium through the end of the project in the fall of 2020. All pedestrian traffic will need to use the sidewalks on the other side of the street during this closure. Contact: Robert Mutzl 765-772-3991
Event LocationLafayetteIN47901 J. R. Kelly Co. will have the following sidewalk closure at Loeb Stadium from 8/15/19 through 11/30/20. The sidewalks on the East side of Main Street and the North Side of Wallace Avenue will be closed adjacent to Loeb stadium through the end of the project in the fall of 2020. All pedestrian traffic will need to use the sidewalks on the other side of the street during this closure. Contact: Robert Mutzl 765-772-3991
More Details
-
August 21, 2019, 7:00 AM - November 27, 2019, 5:00 PM
Lane Restrictions on Beck Ln. between between 9th St. & 18th St. 8/21-11/27 for curb & sidewalk replacement2019-08-21T07:00:00Rieth-Riley will have Lane Restrictions on Beck Lane between 9th Street and 18th Street 8/21/19 to 11/27/19 for curb, sidewalk, drive approach and handicap ramp removal and replacement. Lanes will be restricted at various times throughout the duration of the project. Expect daily lane restrictions. The intent is to do this in four phases. From Davis Drive to 9th Street on the North side. Davis Drive to 18th Street on the North side. 18th Street to Davis Drive on the South side. Davis Drive to 9th Street on the South side. There will be flaggers and signage daily. Contact: J. R. Beaman 765-404-4750
Event LocationLafayetteIN47901 Rieth-Riley will have Lane Restrictions on Beck Lane between 9th Street and 18th Street 8/21/19 to 11/27/19 for curb, sidewalk, drive approach and handicap ramp removal and replacement. Lanes will be restricted at various times throughout the duration of the project. Expect daily lane restrictions. The intent is to do this in four phases. From Davis Drive to 9th Street on the North side. Davis Drive to 18th Street on the North side. 18th Street to Davis Drive on the South side. Davis Drive to 9th Street on the South side. There will be flaggers and signage daily. Contact: J. R. Beaman 765-404-4750
More Details
-
August 26, 2019, 7:00 AM - November 29, 2019, 5:00 PM
Sidewalk Closure on East side of N. 26th St. between Ferry St. & South St. 8/26 - 11/292019-08-26T07:00:00Kettlehut Construction will have the sidewalk closed on the East side of N. 26th Street between Ferry Street and South Street for concrete demolition. Barricade sidewalk to direct pedestrian traffic to the West sidewalk along 26th Street. Contact: Nate Secrest 765-447-2181
Event LocationLafayetteIN47901 Kettlehut Construction will have the sidewalk closed on the East side of N. 26th Street between Ferry Street and South Street for concrete demolition. Barricade sidewalk to direct pedestrian traffic to the West sidewalk along 26th Street. Contact: Nate Secrest 765-447-2181
More Details
-
August 29, 2019, 7:00 AM - November 8, 2019, 5:00 PM
Gas Main installation along West side of S. 18th St from Logan Ave to Teal Rd 8/29 - 11/82019-08-29T07:00:00Vectren/CenterPoint Energy will be installing a gas main along the West side of S. 18th Street between Logan Avenue and Teal Road from 8/29/19 to 11/8/19. Flaggers, signage and cones will be out to divert traffic around construction activities avoiding closing down Southbound lane. Contact: Justin Lubke 765-543-5472
Event LocationLafayetteIN47901 Vectren/CenterPoint Energy will be installing a gas main along the West side of S. 18th Street between Logan Avenue and Teal Road from 8/29/19 to 11/8/19. Flaggers, signage and cones will be out to divert traffic around construction activities avoiding closing down Southbound lane. Contact: Justin Lubke 765-543-5472
More Details
-
September 9, 2019, 7:00 AM - December 31, 2019, 5:00 PM
Sidewalk & Northbound lane Closure on 14th St. from Hartford St. to Tippecanoe St. 9/9 - 12/312019-09-09T07:00:00Denny Excavation will have a Sidewalk Closure and the Northbound lane closed in front of St. Elizabeth Hospital (for Demolition) on 14th Street between Hartford Street and Tippecanoe Street. This will be 9/9/19 to 12/31/19. Watch for traffic control devices. Contact: Suzanne Borges 317-554-2812
Event LocationLafayetteIN47901 Denny Excavation will have a Sidewalk Closure and the Northbound lane closed in front of St. Elizabeth Hospital (for Demolition) on 14th Street between Hartford Street and Tippecanoe Street. This will be 9/9/19 to 12/31/19. Watch for traffic control devices. Contact: Suzanne Borges 317-554-2812
More Details
-
October 1, 2019, 7:00 AM - December 15, 2019, 5:00 PM
Road Closure - Main St between S. 24th St & Perdue St 10/1 to 12/15 for utility and sewer installation2019-10-01T07:00:00Main Street Road Closure from S. 24th Street to Perdue Street for the installation of utilities and sewer upgrades for the new Loeb Stadium project. This will be from 10/1/19 to 12/15/19. Main Street and sidewalks on both sides will be entirely closed. There will not be any access to Main Street from Wallace Avenue, Congress Street or 21st Street during the closure. Arnis and the Original Frozen Custard will be accessible off of Main Street via S. 24th Street and/or from Wallace Street if coming from the East. Watch for Detour signs and barricades to direct traffic during the closure. Contact: Robert Mutzl 765-479-0550
Event LocationLafayetteIN47901 Main Street Road Closure from S. 24th Street to Perdue Street for the installation of utilities and sewer upgrades for the new Loeb Stadium project. This will be from 10/1/19 to 12/15/19. Main Street and sidewalks on both sides will be entirely closed. There will not be any access to Main Street from Wallace Avenue, Congress Street or 21st Street during the closure. Arnis and the Original Frozen Custard will be accessible off of Main Street via S. 24th Street and/or from Wallace Street if coming from the East. Watch for Detour signs and barricades to direct traffic during the closure. Contact: Robert Mutzl 765-479-0550
More Details
-
October 1, 2019, 7:00 AM - November 13, 2019, 5:00 PM
UPDATE Road/Sidewalk Closure 318 N. 9th St. 10/1 to 11/13 @ St. Boniface for masonry and roofing repair2019-10-01T07:00:00UPDATE: North Street from 9th to 8th Street will be closed through Wednesday, Oct. 9th. Road should be re-opened on Thursday, Oct. 10th. Sidewalk will remain closed through mid-November.
Sidewalk Closure on North and East side of St. Boniface (318 N. 9th Street) for masonry and roof repair 10/1/19 to 11/13/19. Watch for barrels, caution tape and signage.
Contact: Brad Dennis 574-532-9146
Event Location318 N 9th StreetLafayetteIN47901 UPDATE: North Street from 9th to 8th Street will be closed through Wednesday, Oct. 9th. Road should be re-opened on Thursday, Oct. 10th. Sidewalk will remain closed through mid-November.
Sidewalk Closure on North and East side of St. Boniface (318 N. 9th Street) for masonry and roof repair 10/1/19 to 11/13/19. Watch for barrels, caution tape and signage.
Contact: Brad Dennis 574-532-9146
More Details
-
October 9, 2019, 8:00 AM - November 13, 2019, 5:00 PM
St Boniface Church Parking & Sidewalk Closed on N. 9th St. & North St. @ 9th 10/9-11/132019-10-09T08:00:00St. Boniface Church will have the sidewalk and the parking along 9th Street @ North Street. North and Southbound traffic will remain open. North Street will be Closed until 10/9/19. This is to allow for boom lift to work on church. This will be from 10/8/19 to 11/13/19. Watch for signage and traffic control. Contact: Brad Dennis 574-532-9146
Event LocationLafayetteIN47901 St. Boniface Church will have the sidewalk and the parking along 9th Street @ North Street. North and Southbound traffic will remain open. North Street will be Closed until 10/9/19. This is to allow for boom lift to work on church. This will be from 10/8/19 to 11/13/19. Watch for signage and traffic control. Contact: Brad Dennis 574-532-9146
More Details
-
October 15, 2019, 7:00 AM - August 16, 2020, 5:00 PM
Lane Closures on Eastbound lanes 2100' N. Schuyler Ave. 10/15/19-8/16/20 water & sewer project2019-10-15T07:00:00Atlas Excavating will have Lane closures on the Eastbound lanes of Schuyler Ave. from Sagamore Pkwy 2100' North. Traffic will be routed to two-way traffic in the Westbound lane. Watch for signage and traffic control devices, Contact: Nikki Hauser 765-429-4800
Event LocationLafayetteIN47901 Atlas Excavating will have Lane closures on the Eastbound lanes of Schuyler Ave. from Sagamore Pkwy 2100' North. Traffic will be routed to two-way traffic in the Westbound lane. Watch for signage and traffic control devices, Contact: Nikki Hauser 765-429-4800
More Details
-
October 28, 2019, 7:00 AM - November 8, 2019, 5:00 PM
Intersection of 5th St. & Alabama St.will be closed 10/28 - 11/8 for sewer work to continue.2019-10-28T07:00:00Bowen Engineering will have the intersection of 5th Street and Alabama Street closed from 10/28/19 to 11/8/19 for the continuation of sewer work. Signge will be installed to detour traffic. Contact: Nick Isenhower 317-518-9721
Event LocationLafayetteIN47901 Bowen Engineering will have the intersection of 5th Street and Alabama Street closed from 10/28/19 to 11/8/19 for the continuation of sewer work. Signge will be installed to detour traffic. Contact: Nick Isenhower 317-518-9721
More Details
-
November 1, 2019, 6:00 PM - November 4, 2019, 6:00 AM
Lane restrictions & road closure on Greenbush between 9th & 10th 11/1-11/4 for road resurfacing2019-11-01T18:00:00Rieth-Riley will be resurfacing the intersection of 9th Street and Greenbush Street 11/1/19 as a night job. There will be some work done during the day on 11/1/19 with flaggers present. This will be starting at 6 PM going to 6 AM. Depending on weather they have until 11/4/19 to finish paving. There will be a hard closure in place at 10th Street on Greenbush Street, the detour will lead traffic to 9th Street. The intersection of 9th Street and Greenbush Street will still be accessable, down to one lane. There will be flaggers in place to make sure traffic flows correctly. Contact: Dakota Atkins 219-207-1049
Event LocationLafayetteIN47901 Rieth-Riley will be resurfacing the intersection of 9th Street and Greenbush Street 11/1/19 as a night job. There will be some work done during the day on 11/1/19 with flaggers present. This will be starting at 6 PM going to 6 AM. Depending on weather they have until 11/4/19 to finish paving. There will be a hard closure in place at 10th Street on Greenbush Street, the detour will lead traffic to 9th Street. The intersection of 9th Street and Greenbush Street will still be accessable, down to one lane. There will be flaggers in place to make sure traffic flows correctly. Contact: Dakota Atkins 219-207-1049
More Details
-
November 4, 2019, 7:00 AM - November 16, 2019, 5:00 PM
Road Closure on Kossuth St. between 4th & 5th St. 11/4 to 11/16 for water main installation.2019-11-04T07:00:00Road Closure on Kossuth Street between 11/4/19 to 11/16/19 for water main installation and testing. Kosuth Street from 4th Street to 5th Street will be closed to traffic from 11/4 to 11/8 for water main installation. The week of 11/11 to 11/16 the road will be closed sporadically for testing of the newly installed water main. The contractor will open up the road to traffic in between the water main installation and testing. Contact: Bret Dierdorf 765-637-9124.
Event LocationLafayetteIN47901 Road Closure on Kossuth Street between 11/4/19 to 11/16/19 for water main installation and testing. Kosuth Street from 4th Street to 5th Street will be closed to traffic from 11/4 to 11/8 for water main installation. The week of 11/11 to 11/16 the road will be closed sporadically for testing of the newly installed water main. The contractor will open up the road to traffic in between the water main installation and testing. Contact: Bret Dierdorf 765-637-9124.
More Details
-
November 4, 2019, 7:00 PM - November 7, 2019, 7:00 AM
Road Restrictions Downtown on 2nd, 3rd and Main St. 11/4 - 11/7 for milling & paving2019-11-04T19:00:00Road Restrictions on 2nd Street between Ferry Street and Alabama Street, 3rd Street between the bus station entrance and Columbia Street and Main Street between 2nd Street and 4th Street for milling and paving. This will be 11/4/19 to 11/7/19 between the hours of 7 PM to 7 AM. This will be a flagged operation. Contact: J.R. Beaman 765-404-4750
Event LocationLafayetteIN47901 Road Restrictions on 2nd Street between Ferry Street and Alabama Street, 3rd Street between the bus station entrance and Columbia Street and Main Street between 2nd Street and 4th Street for milling and paving. This will be 11/4/19 to 11/7/19 between the hours of 7 PM to 7 AM. This will be a flagged operation. Contact: J.R. Beaman 765-404-4750
More Details