  1. Sidewalk Closed East side 5th between Columbia & South & North side of South from 5th to alley

    October 4, 2018, 7:00 AM - April 20, 2020, 5:00 PM

    Star City Crossing will have the sidewalk closed on the East side of 5th Street between South Street and Columbia Street, sidewalk will also be closed on the North side of South Street between 5th Street and the Alley just West of City Hall for the construction of a new building. This will be from 10/4/18 to 4/30/20. Chain link fence has been placed around site. Contact: Jon Caron 765-414-3995

    More Details
  2. Moving Road Closures on North St from 3rd - 7th St 3/25 - 8/30 for Road Construction

    March 25, 2019, 7:00 AM - August 30, 2019, 5:00 PM

    Rieth-Riley will will be having moving road closures on North Street between 3rd Street and 7th Street for road construction from 3/25/19 to 8/30/19. Starting on 3/25/19 North Street will be closed between 3rd Street and 4th Street. Traffic will need to follow detour routes in each closure area. Utilities will start relocating starting the week of 3/25 and road construction will begin 4/1. Road construction will progress Eastbound closing off blocks of North Street as the work is accomplished (moving closures). 4th Street will be closed on or around 4/15 and will reopen the first week of May. As the work progresses finished blocks West of the closure area will open up to traffic. Follow the detour route signage that will be placed during the closures. Contact: Mike Rominger 765-656-4612

    More Details
  3. Walking trail closure & construction of new drives @ CR 430 S & S. 18th St 4/4 to 12/30

    April 4, 2019, 7:00 AM - December 30, 2019, 5:00 PM

    Kettlehut Construction will be installing temporary construction drives and eventually the installation of permanent new drives for TCPL South Branch Library. Closure locations approx. 50' of walking trail North of CR 430 S to the West of roundabout at intersection with S. 18th Street. Approx. 66' of walking trail on the West side of S. 18th Street to the North of roundabout at intersection with CR 430 S. from 4/4/19 to 12/30/19. Closures will be at construction drives for new South Branch Library. Existing walking trail will be removed and stone construction drive utilized until permanent drive paving and new concrete sidewalk can be installed late summer or early fall. Construction fencing and signage will be posted to alert general public of walking trail closures. Contact: Nate Secrest 765-447-2181

    More Details
  4. 3 Parking Spaces Closed-S. side Main St between 3rd & 4th St on the East end 5/6-9/20 for Courthouse renovation

    May 6, 2019, 7:00 AM - September 20, 2019, 5:00 PM

    Tecton will have 3 parking spaces closed off for a dumpster for Tippecanoe County Courthouse Renovations. This will be on the South side of Main Street between 3rd Street and 4th Street at 4th Street. A dumpster with cones will be placed in the closed off parking spaces. Contact: Nathan Wireman 219-393-0113

    More Details
  5. Periodic lane closures on Union , 12th & 13th from 5/20-6/28 doing construction on Union Place Apts.

    May 20, 2019, 7:00 AM - June 28, 2019, 7:00 PM

    Keller Development will have periodic lane closures from 7:00 am to 7:00 pm on 5/20/19 to 6/28/19 on the North lane of Union Street between 12th Street and 13th Street. East lane of 12th Street between Union Street and Salem Street and West lane of 13th Street between Union Street and Salem Street. This will be for moving equipment and supplies to finish construction of the building. Watch for barrels and traffic control and signage. Contact: Mark Snyder 260-348-1976

    More Details
  6. Road Closure on Main St between 11th St & 12 St 5/20-7/12 for drainage improvements

    May 20, 2019, 7:00 AM - July 12, 2019, 5:00 PM

    Bowen Engineering will have Main Street Closed from N. 11th Street to N. 12th Street (including intersection) from 5/20/19 to 7/12/19 for street drainage improvements. Watch for flagmen, maintenance of traffic signage to detour vehicular traffic as well as sidewalk detours for pedestrian traffic. Contact: Nick Isenhower 317-518-9721

    More Details
  7. Moving Road Closure-Vinton St., Longlois Dr. & 29th St. 6/10-10/25 WaterMain Replacement

    June 10, 2019, 7:00 AM - October 25, 2019, 5:00 PM

    TSW Utilities will be having moving road closures in the Vinton Subdivision. The following roads will have limited access, local traffic only: Vinton Street from Elmwood Ave. to Longlois Dr., Longlois Drive (South end) from Elmwood Ave. to Elmwood Ave., 29th Street from Longlois Dr. to Vinton St., Prairie Lane will have temporary road closure. Watch for Road Construction Ahead and Road Closed Ahead signs and Local Traffic Only signs. Contact: Terry Ratliff 317-354-5111

    More Details
  8. Lane Closure-Northbound 4th St from Owen to Kossuth St 6/12-7/30 to install new water main

    June 12, 2019, 7:00 AM - July 30, 2019, 5:00 PM

    Atlas Excavating will have a Northbound lane closure on S. 4th Street between Kossuth Street and Owen Street for the installation of a new water main. This will be 6/12/19 to 7/30/19. Watch for Traffic Signage (Detour and Road Closed Signs) as well as Message Boards. Southbound may have temporary closures in non-rush hours. Flaggers will be used for these occasions. This will be the first phase of road closures. There will be more information coming as the project moves along S. 4th Street between Montifiore Street and Saw Mill Run. Contact: Keith O'Brien 765-479-0847

    More Details
  9. Sidewalk & South St Closed Indefinitely between Main St & 18th Street

    June 13, 2019, 3:00 PM - December 31, 2019, 5:00 PM

    Sidewalk and South Street between Main Street and 18th Street has been closed Indefinitely. Contact: Mark Gick 765-807-1050

    More Details
  10. Road Closure on Kossuth St from 4th St to 5th St for water main installation 6/19-6/24

    June 19, 2019, 7:00 AM - June 24, 2019, 5:00 PM

    Atlas Excavating will have a road closure on Kossuth Street between 4th Street and 5th Street for the installation of a water main. This will be from 6/19/19 to 6/24/19. Watch for traffic control signage (Detour, Road Closed and Directional). Contact: Andrew Gordon 317-402-2051

    More Details
  11. Road Closure on Hartford St between 6th St & 7th St 6/20 - 6/23 for street painting

    June 20, 2019, 7:00 AM - June 23, 2019, 5:00 PM

    Faith Lafayette will have Hartford Street closed from N. 6th Street to the Alley between N. 6th Street and N. 7th Street for street painting. Watch for barricades. Contact: Lori Walters 765-448-1986

    More Details
  12. St. Lawrence Church will have Eucharistic walk 6/23 from 12 noon-1pm on 19th, Perrine, 20th to alley back to 19th

    June 23, 2019, 12:00 PM - 1:00 PM

    St. Lawrence Church will have their Eucharistic procession on the Catholic feast of Corpus Christi 6/23/19 from 12:00 Noon to 1:00 PM along N. 19th Street, Perrine Street, N. 20th Street then down Alley and back to N. 19th Street. Contact: Fr. Eric Underwood 765-742-2107

    More Details
  13. St. Boniface walk around the block, 9th, Ferry, 8th & North 6/23 from 7pm - 8pm

    June 23, 2019, 7:00 PM - 8:00 PM

    St. Boniface Church will have their Corpus Christi Procession walk around the block. They will be using the street. This will be 6/23/19 from 7:30 pm to 8:00 pm. Watch for pedestrians. Contact: Grant Freeman 765-430-8307