Boards & Commissions

  1. TRAFFIC COMMISSION MEETING

    March 3, 2020, 4:00 PM - 5:00 PM @ Common Council Chamber

    More Details

Engineering & Public Works

  1. Sidewalk Closed East side 5th between Columbia & South & North side of South from 5th to alley

    October 4, 2018, 7:00 AM - April 20, 2020, 5:00 PM

    Star City Crossing will have the sidewalk closed on the East side of 5th Street between South Street and Columbia Street, sidewalk will also be closed on the North side of South Street between 5th Street and the Alley just West of City Hall for the construction of a new building. This will be from 10/4/18 to 4/30/20. Chain link fence has been placed around site. Contact: Jon Caron 765-414-3995

    More Details
  2. Sidewalk Closure 8/15/19 - 11/30/20 @ Loeb Stadium East side of Main St. & North side of Wallace

    August 15, 2019, 7:00 AM - November 30, 2020, 5:00 PM

    J. R. Kelly Co. will have the following sidewalk closure at Loeb Stadium from 8/15/19 through 11/30/20. The sidewalks on the East side of Main Street and the North Side of Wallace Avenue will be closed adjacent to Loeb stadium through the end of the project in the fall of 2020. All pedestrian traffic will need to use the sidewalks on the other side of the street during this closure. Contact: Robert Mutzl 765-772-3991

    More Details
  3. Lane Closures on Eastbound lanes 2100' N. Schuyler Ave. 10/15/19-8/16/20 water & sewer project

    October 15, 2019, 7:00 AM - August 16, 2020, 5:00 PM

    Atlas Excavating will have Lane closures on the Eastbound lanes of Schuyler Ave. from Sagamore Pkwy 2100' North. Traffic will be routed to two-way traffic in the Westbound lane. Watch for signage and traffic control devices, Contact: Nikki Hauser 765-429-4800

    More Details
  4. Sidewalk & parking closure also alley closure @ 1007 Main St 11/13/19-8/31/20 for construction of restaurant

    November 13, 2019, 7:00 AM - August 31, 2020, 5:00 PM

    Sidewalk Closure and street closure in front of 1007 Main Street for construction of new restaurant. This will be from 11/13/19 to 8/31/20. Long term closure of sidewalk is needed to construct a new 2 story restaurant. At times they will have to close parking and limit traffic to one lane during concrete pours, large deliveries and utility work. Flagmen will be used when traffic is limited to a single lane. Watch for sidewalk closed signs. Contact: Levi Evans 765-427-2472

    More Details
  5. Lane Restrictions on Teal Rd. between S. 18th St. & Poland Hill Rd. 1/16/20 - 3/31/20

    January 16, 2020, 8:00 AM - March 31, 2020, 5:00 PM

    Lane Restrictions on Teal Road between S. 18th Street and Poland Hill Road 1/16/20 to 3/31/20 between 8 AM to 5 PM. Locations will change daily. Duke Energy is doing upgrades and relocating there power lines at different locations. There may be delays. Watch for construction signs, cones and flaggers. Contact: Terry Belcher 317-385-0928

    More Details
  6. Temporary lane closures on Elston Rd. between Old US 231 and Old Romney Rd. installing gas line.

    January 31, 2020, 7:00 AM - April 27, 2020, 5:00 PM

    Patton Construction will have temporary lane closures on Elston Road between Old Romney Road and Old US 231 for the installation of gas a gas main. Watch for traffic control devices, cones, signs and flaggers. Contact: Duffy Anthrop 765-418-7575

    More Details
  7. Road closures on 4th St and Alabama St for sewer project 3/2-3/13 Watch for Detours

    March 3, 2020, 8:00 AM - March 13, 2020, 5:00 PM

    Bowen Engineering will have road closures on the South and North bound lanes on 4th Street and the East and West bound lanes on Alabama Street. Watch for full set up of traffic control devices. Construction will begin in the intersection of 4th Street and Alabama Street and continue South for 300' ending at the Pearl River sewer. Special provisions will be provided for business owners. Contact: Daniel Hochstetler 317-220-5489

    More Details