Boards & Commissions

  1. Board of Zoning Appeals of Tippecanoe County Lafayette Division

    August 17, 2020, 4:00 PM - 5:00 PM @ Board of Works Room

    More Details

Engineering & Public Works

  1. Sidewalk Closure 8/15/19 - 11/30/20 @ Loeb Stadium East side of Main St. & North side of Wallace

    August 15, 2019, 7:00 AM - November 30, 2020, 5:00 PM

    J. R. Kelly Co. will have the following sidewalk closure at Loeb Stadium from 8/15/19 through 11/30/20. The sidewalks on the East side of Main Street and the North Side of Wallace Avenue will be closed adjacent to Loeb stadium through the end of the project in the fall of 2020. All pedestrian traffic will need to use the sidewalks on the other side of the street during this closure. Contact: Robert Mutzl 765-772-3991

    More Details
  2. Sidewalk & parking closure also alley closure @ 1007 Main St 11/13/19-8/31/20 for construction of restaurant

    November 13, 2019, 7:00 AM - August 31, 2020, 5:00 PM

    Sidewalk Closure and street closure in front of 1007 Main Street for construction of new restaurant. This will be from 11/13/19 to 8/31/20. Long term closure of sidewalk is needed to construct a new 2 story restaurant. At times they will have to close parking and limit traffic to one lane during concrete pours, large deliveries and utility work. Flagmen will be used when traffic is limited to a single lane. Watch for sidewalk closed signs. Contact: Levi Evans 765-427-2472

    More Details
  3. 7th St Lane Closure

    June 22, 2020 - August 17, 2020

    The parking lanes of 7th Street from Main to South Street will be closed from June 22nd to August 17th for work on the Pearl River Sewer Relocation Project. Contact: Daniel Hochstetler 317-220-5489

    More Details
  4. Twyckenham DIRECTION CHANGE

    July 22, 2020 - October 3, 2020

    Twyckenham Boulevard will be switching from west bound traffic in the north lane to east bound traffic in the south lane starting July 22nd and going until approximately October 3rd, 2020. The is for the next phase of construction. Contact: Joe Ratcliff 765-427-4416 Milestone

    More Details
  5. Main Street & 11th Street Road Closures

    July 24, 2020 - October 5, 2020

    Rieth Riley will be closing Main Street from the centerline to the right of way between 10th and 11th street. Westbound traffic on Main will have one lane of travel west. Eastbound traffic will be closed from 9th street and Main to 11th and Main. Follow the detour for (Eastbound main) going North on 9th to Ferry going east to 11th and going south to Main. The west side parking on 11th will also be closed. They will also be closing the NW, SW, SE corners of Main Street & 10th street and 100' west of the NW corner and SW corner of the intersection of Main and 10th will be closed too. Contact: Mike Rominger 765-656-4612 Rieth-Riley

    More Details
  6. 30th Street Road Closure

    August 3, 2020 - September 19, 2020

    S 30th Street will be closed from Teal Rd to Summer Street from August 3rd to September 19th. The detour route will be Sagamore Parkway, Maple Pointe Drive, Concord Road and Summer Street. Watch for signs and allow extra time. Contact: Nikki Hauser 765-585-7332 Atlas Excavating

    More Details
  7. Lane Closures on 36th St for road reconstruction starting 8/8 - 9/18

    August 8, 2020, 8:00 AM - September 18, 2020, 5:00 PM

    Lane closures are scheduled on 36th St from UPS property to Union Street from 8/8 - 9/18. The road will be restricted to one way either southbound or northbound. Please watch for signs indicating the one way restrictions. For questions or concerns please contact Josh Coles. Phone (317) 964-9519 Email josh.coles@milestonelp.com

    More Details
  8. Restrictions and Delays related to Asphalt Patching & Paving from US 52/25 Intersection to just South of Veterans Memorial Pkwy starting August 13 - September 18.

    August 13, 2020, 8:00 AM - September 18, 2020, 5:30 PM

    There will be flagging operations between Us 52 and Veterans Memorial Pkwy. for asphalt patching and paving. Expect delays while crews work through the Veterans Memorial intersection. There will be various Paving equipment on site such as Milling machine, dump trucks, Broom, paver rollers, backhoe. Flaggers will be present with adequate signage to cover our work zones. For questions or concerns please contact J.R. Beaman. Phone (765) 404-4750 Email jbeaman@reith-riley.com

    More Details
  9. Daily Closure Planned on North Street in front of St. Boniface School M-F from 11:35 AM to 12:05 PM. This closure is scheduled to begin on Monday, August 17th and continue for the duration of the school year.

    August 17, 2020, 11:35 AM - June 4, 2021, 12:05 PM

    The temporary school day closures to allow for extra space during recess will be on North Street from St. Michael Center to 8th Street starting on Monday, August 17th until the end of the school year. The alleys and parking lots in the area will remain accessible during this time. The closure will be for 30 minutes starting at 11:35 am and ending at 12:05 pm. There will be safety barricades at each end of the closure. Please use extreme caution in this area during these times. For questions or concerns please contact Sr. Lenore Schwartz. Phone (765) 742-7913 Email srlenore@lcss.org

    More Details