Where do I go to apply for a Building Permit?
The Engineering Department is located on the 2nd floor of City Hall, 20 North 6th Street, and is responsible for reviewing requests, applications and issuing permits for projects involving any of the following activities:
- Building
- Demolition
- Electric
- Enforcement
- Right of Way
- Sewer Taps
- Signs
- Street Light Requests
- Variance Requests
- Water TapsEngineering Department

Show All Answers

1. When is a Design Professional required for my project?
2. When is a State Construction Design Release (CDR) required?
3. What is a Class I structure?
4. Where do I go to apply for a Building Permit?
5. How long does a typical plan review take?
6. If I am remodeling an apartment building with 3 or more units, is the building classified as Residential?
7. What is Fire-Resistance-Rated Construction?
8. Is a fire wall the same as a fire barrier?
9. What is the difference between fire stopping and fire blocking?
10. What is meant by "a change of use or occupancy" and when does it apply?
11. When is a Knox Box (key box) required?
12. Where can I purchase a Knox Box?
13. When is a Design Professional required for my project?
14. When is a State Construction Design Release (CDR) required?