Calendar

View All Calendars is the default. Choose Select a Calendar to view a specific calendar. Subscribe to calendar notifications by clicking on the Notify Me® button, and you will automatically be alerted about the latest events in our community.

Engineering & Public Works

  1. Sidewalk Closure 8/15/19 - 11/30/20 @ Loeb Stadium East side of Main St. & North side of Wallace

    August 15, 2019, 7:00 AM - November 30, 2020, 5:00 PM

    J. R. Kelly Co. will have the following sidewalk closure at Loeb Stadium from 8/15/19 through 11/30/20. The sidewalks on the East side of Main Street and the North Side of Wallace Avenue will be closed adjacent to Loeb stadium through the end of the project in the fall of 2020. All pedestrian traffic will need to use the sidewalks on the other side of the street during this closure. Contact: Robert Mutzl 765-772-3991

    More Details
  2. Twyckenham DIRECTION CHANGE

    July 22, 2020 - October 3, 2020

    Twyckenham Boulevard will be switching from west bound traffic in the north lane to east bound traffic in the south lane starting July 22nd and going until approximately October 3rd, 2020. The is for the next phase of construction. Contact: Joe Ratcliff 765-427-4416 Milestone

    More Details
  3. Main Street & 11th Street Road Closures

    July 24, 2020 - October 5, 2020

    Rieth Riley will be closing Main Street from the centerline to the right of way between 10th and 11th street. Westbound traffic on Main will have one lane of travel west. Eastbound traffic will be closed from 9th street and Main to 11th and Main. Follow the detour for (Eastbound main) going North on 9th to Ferry going east to 11th and going south to Main. The west side parking on 11th will also be closed. They will also be closing the NW, SW, SE corners of Main Street & 10th street and 100' west of the NW corner and SW corner of the intersection of Main and 10th will be closed too. Contact: Mike Rominger 765-656-4612 Rieth-Riley

    More Details
  4. Daily Closure Planned on North Street in front of St. Boniface School M-F from 11:35 AM to 12:05 PM. This closure is scheduled to begin on Monday, August 17th and continue for the duration of the school year.

    August 17, 2020, 11:35 AM - June 4, 2021, 12:05 PM

    The temporary school day closures to allow for extra space during recess will be on North Street from St. Michael Center to 8th Street starting on Monday, August 17th until the end of the school year. The alleys and parking lots in the area will remain accessible during this time. The closure will be for 30 minutes starting at 11:35 am and ending at 12:05 pm. There will be safety barricades at each end of the closure. Please use extreme caution in this area during these times. For questions or concerns please contact Sr. Lenore Schwartz. Phone (765) 742-7913 Email srlenore@lcss.org

    More Details
  5. Road Closure-Intersection of Columbia & N. 7th St. 9/14-10/2 for Pearl River Sewer Relocation Project

    September 14, 2020, 7:00 AM - October 2, 2020, 5:00 PM

    Bowen Engineering will have a Road Closure on Main Street between N. 8th Street and N.6th Street 9/14/20 to 10/2/20 for the Pearl River Sewer Relocation Project. The sidewalks however will remain open for access to the businesses. Contact: Daniel Hochstetler Phone: 317-220-5489 email: dhochstetler@bowenengineering.com

    More Details
  6. East bound Main St. Closed from 9th St. to 11th St. 9/29-11/30 for Streetscape Ph. 3

    September 29, 2020, 7:00 AM - November 30, 2020, 5:00 PM

    East bound Main Street will be closed from 9th Street to 11th Street. Continue to follow detour signs that are present. Also, 10th Street from Main Street to Columbia Street will be closed. This will be from 9/29/20 to 11/30/20, all part of the Main Street Streetscape Phase 3 Project. Contact: Mike Rominger Phone: 765-447-2324 email: mrominger@rieth-riley.com

    More Details
  7. Road Closure on Underwood St. at R.R. tracks (between Whitcomb & N. 24th St. 9/29-10/2 for R.R. track repair.

    September 29, 2020, 7:00 AM - October 2, 2020, 5:00 PM

    Norfolk Southern will have Underwood St. Closed at R.R. tracks (between Whitcomb and N. 24th St.) for repair of tracks from 9/29/20 to 10/2/20. Watch for construction signage and detour signage. Contact: James Woody Phone: 304-542-0721 email: jwoody@roadsafetraffic.com

    More Details
  8. Pyramid Signs refurbishing sign @ 605 Main Street 9/30-10/7.

    September 30, 2020, 7:00 AM - October 7, 2020, 5:00 PM

    Pyramid Signs will be refurbishing signage at 605 Main Street from 9/30/20 to 10/7/20. Watch for sidewalk detour. Contact: Rex Deaton Phone: 765-447-4174 email: pyramidsign@comcast.com

    More Details
  9. Emergency Sewer Lateral Repair @ 1722 Charles Street 10/1-10/2. Traffic will be able to go both ways.

    October 1, 2020, 8:00 AM - October 2, 2020, 5:00 PM

    Emergency Sewer Lateral Repair at 1722 Charles Street 10/1 to 10/2. There will be an 8' x 8' square cut in the Westbound lane and parking area. Traffic will still be able to go both ways. It will be plated. Contact: Luke Hoskins Phone: 317-691-1880 email: Luke@petermanhvac,com

    More Details
Facility Submit Event Print Email Event Subscription View RSS Feeds Select on Calendar Expand Collapse Previous Next Down Up Map Share Show more
Agenda