Engineering & Public Works

  1. Sidewalk Closure 8/15/19 - 11/30/20 @ Loeb Stadium East side of Main St. & North side of Wallace

    August 15, 2019, 7:00 AM - November 30, 2020, 5:00 PM

    J. R. Kelly Co. will have the following sidewalk closure at Loeb Stadium from 8/15/19 through 11/30/20. The sidewalks on the East side of Main Street and the North Side of Wallace Avenue will be closed adjacent to Loeb stadium through the end of the project in the fall of 2020. All pedestrian traffic will need to use the sidewalks on the other side of the street during this closure. Contact: Robert Mutzl 765-772-3991

    More Details
  2. Daily Closure Planned on North Street in front of St. Boniface School M-F from 11:35 AM to 12:05 PM. This closure is scheduled to begin on Monday, August 17th and continue for the duration of the school year.

    August 17, 2020, 11:35 AM - June 4, 2021, 12:05 PM

    The temporary school day closures to allow for extra space during recess will be on North Street from St. Michael Center to 8th Street starting on Monday, August 17th until the end of the school year. The alleys and parking lots in the area will remain accessible during this time. The closure will be for 30 minutes starting at 11:35 am and ending at 12:05 pm. There will be safety barricades at each end of the closure. Please use extreme caution in this area during these times. For questions or concerns please contact Sr. Lenore Schwartz. Phone (765) 742-7913 Email srlenore@lcss.org

    More Details
  3. East bound Main St. Closed from 9th St. to 11th St. 9/29-11/30 for Streetscape Ph. 3

    September 29, 2020, 7:00 AM - November 30, 2020, 5:00 PM

    East bound Main Street will be closed from 9th Street to 11th Street. Continue to follow detour signs that are present. Also, 10th Street from Main Street to Columbia Street will be closed. This will be from 9/29/20 to 11/30/20, all part of the Main Street Streetscape Phase 3 Project. Contact: Mike Rominger Phone: 765-447-2324 email: mrominger@rieth-riley.com

    More Details
  4. Demo & curb replacement to make ready for asphalt @ intersection of S. 24th St. & Wallace Ave., 250' along Wallace. 10/14/20-1/13/21

    October 14, 2020, 7:00 AM - January 13, 2021, 5:00 PM

    Demo and curb replacement from the intersection of S. 24th Street and Wallace Avenue, 250' East along Wallace Avenue from 10/14/20 to 1/13/21. This is to make ready for asphalt for the Loeb Stadium project. Two-way traffic will be maintained. There will be a shift to allow this. Watch for signage and temporary stripping. Have Caution through this area. Contact: David Britton Phone: 765-479-1504 email: dbritton07@gmail.com

    More Details
  5. Signal re-construction @ 5th & South St. 10/19/20-11/16/20.

    October 19, 2020, 7:00 AM - November 16, 2020, 5:00 PM

    Signal Re-Construction at the intersection 5th Street and South Street 10/19/20 to 11/16/20. This is not a road closure. This is to notify that the signal will be removed and during construction the intersection will become a 2-way stop. There will be 2 stop signs, Northbound 5th Street and Southbound 5th Street. With additional signage, 'Cross Traffic Does Not Stop'. Also there will be 2 signs stating 'New Traffic Pattern Ahead'. Contact: Nick Standerfer Phone: 765-807-1400 email: nstanderfer

    More Details
  6. Wallace Avenue between Park Avenue and 24th Street will be closed starting Oct. 26 - Dec. 11 as part of Loeb Stadium Project

    October 26, 2020, 8:00 AM - December 11, 2020

    Beginning October 26th Wallace Avenue will be completely closed to through traffic between Park Avenue and 24th Street. The street closure is required to allow installation of new curbs and pavement associated with the Loeb Stadium project. The road will re-open by December 11th. Contact: Rob Mutzl (765) 772-3991

    More Details
  7. Sidewalk & parking space closure N. side of Alabama St. between 4th St. & 5th St. 11/5-11/30

    November 5, 2020, 7:00 AM - November 30, 2020, 5:00 PM

    Sidewalk and 5 parking spaces will be closed on the North side of Alabama Street between 4th Street and 5th Street 11/5/20 to 11/30/20 ti install a temporary entrance into the Regions/Ellsworth project. There will be 'Sidewalk Closed' signs and barricades. Contact: Jeff Rigdon Phone: 317-538-0588 email: jrigdon@rigdonconstruction.com

    More Details
  8. Main St. Road Closure between N. 8th St. & N. 6th St. 11/9/20-11/16/20 for Pearl River Relocation Project

    November 9, 2020, 7:00 AM - November 16, 2020, 5:00 PM

    Main Street will be closed between N.8th Street and N. 6th Street 11/9/20 to 11/16/20 for work at the intersection of Main Street and N.7th Street for the Pearl River Relocation Project. Contact: Daniel Hochstetler Phone: 317-220-5489 email: dhochstetler@bowenengineering.com

    More Details
  9. Lane Restrictions on Ortman Lane between S. 18th St. & S. 9th St. 11/12/20-11/19/20 for milling & paving.

    November 12, 2020, 7:00 AM - November 19, 2020, 5:00 PM

    Lane Restrictions on Ortman Lane from 580' West of S. 18th Street to S. 9th Street for milling and paving. This will be from 11/12/20 to 11/19/20. This will be a flagging operation. Watch for construction signage. Contact: Dakota Atkins Phone: 219-207-1049 email: datkins@rieth-riley.com

    More Details
  10. Sidewalk & parking space closure @ 818 & 822 Main St. 11/13/20 -12/2/20 for masonry repair.

    November 13, 2020, 7:00 AM - December 2, 2020, 5:00 PM

    Sidewalk and (3) parking space closures at 818 and 822 Main Street 11/13/20 to 12/2 20 for masonry repairs. There will be 'Sidewalk Closed' signs at each end of project. Watch for cones and caution tape blocking sidewalk and parking spaces. Contact: Lindsey Bogan Phone: 765-463-0559 email: lindsey@biancofiori.com

    More Details