  1. Daily Closure Planned on North Street in front of St. Boniface School M-F from 11:35 AM to 12:05 PM. This closure is scheduled to begin on Monday, August 17th and continue for the duration of the school year.

    August 17, 2020, 11:35 AM - June 4, 2021, 12:05 PM

    The temporary school day closures to allow for extra space during recess will be on North Street from St. Michael Center to 8th Street starting on Monday, August 17th until the end of the school year. The alleys and parking lots in the area will remain accessible during this time. The closure will be for 30 minutes starting at 11:35 am and ending at 12:05 pm. There will be safety barricades at each end of the closure. Please use extreme caution in this area during these times. For questions or concerns please contact Sr. Lenore Schwartz. Phone (765) 742-7913 Email srlenore@lcss.org

    More Details
  2. Driving lane, parking & sidewalk closures for the Ellsworth Project construction 12/28/20 to 7/29/22

    December 28, 2020, 7:00 AM - July 29, 2022, 5:00 PM

    Construction of the Ellsworth Project, closures for construction, deliveries, hoisting and trash removal from 12/28/20 to 7/29/22. Closure locations: South Street sidewalk and parking from 4th Street to 5th Street; 5th Street Southbound lane and sidewalk; Alabama Street Westbound lane and sidewalk. Detail summary of closures: Installing jersey barriers with chain link fence on top of barriers, closing off parking and sidewalk on the South side of South Street from the entry into Regions Bank parking lot, East to 5th Street; then the Southbound lane and sidewalk on 5th Street from South Street to Alabama Street; then the Westbound lane and sidewalk on Alabama Street from 5th Street to 4th Street. Watch for Construction/Closure/Detour signage and traffic control devices throughout the construction of the project. Contact: Jeff Rigdon Phone: 317-538-0588 email: jrigdon@rigdonconstruction.com

    More Details
  3. Sidewalk closed during new building construction at 631 Main Street from 1/26/21 to 5/30/22.

    January 26, 2021, 7:00 AM - May 30, 2022, 5:00 PM

    Sidewalk closure at 631 Main Street from 1/26/21 to 5/30/22 for new building construction. There is a fence that serves as a safety barrier and sidewalk closed signs in place. Contact: Tim O'Bryan Phone: 765-427-9213 email: tobryan@mcon2.com

    More Details
  4. Starting 3/29/2021 - 5/1/2021: Limited Closures planned for Columbia St. between N 5th St and N 6th St. for cable replacement.

    March 29, 2021, 8:00 AM - May 1, 2021

    Limited closures planned for Columbia St between N 5th St and N 6th St starting 3/29/2021 - 5/1/2021 for cable replacement. Closures planned for evening hours to alleviate heavy traffic concerns and should only last for 1-2 hours at a time. Please call Duke Energy or ARC at the contacts listed below with any questions or concerns. Duke Energy Trent Godsey 317-982-2659 Trent.Godsey@duke-energy.com ARC Terry Belcher 317-385-0928

    More Details
  5. Road Closure on Stinger St. between Creasy Ln. & Daisy Dr. 4/26/21 to 6/21/21 for reconstruction of street

    April 26, 2021, 7:00 AM - June 21, 2021, 5:00 PM

    Stinger Street will be closed from or after 4/26/21 to 6/21/21 for street reconstruction, ramps and sidewalk. The sidewalk on Creasy Lane will also be closed during the first part of this project as the entrance becomes wider and new ramp installed on North side of entrance. There will be daily lane restrictions with an arrow board for the first few weeks to get the entrance portion complete. Watch for signage, barrels, cones etc. Contact: Mike Weathers Phone: 765-714-7686 email: heartlandexcmike@gmail.com

    More Details
  6. Sidewalk & Crosswalk improvements @ Main & Kossuth 4/30/21-7/30/21

    April 30, 2021, 8:00 AM - July 30, 2021, 5:00 PM

    J. R. Kelly will be closing the sidewalk on the West side of Main Street from Kossuth Street to the intersection at Congress Street. Also, closing the sidewalk on the South side of Kossuth Street between Main Street and 20' West of 23rd Street. J. R. Kelly will completely close the intersection of 23rd Street and Wallace Street just North of the old Osco parking lot (New Loeb parking lot). Traffic control barrels will be installed on the South side of Kossuth Street starting just West of 23rd Street and extending to Main Street to allow replacement of curbs and walks as needed on the South side of Kossuth Street. They will install barrels along the West side of Main Street from Kossuth Street to Wallace Street. This does not close a lane but will channel traffic away from the edge of the sidewalk to protect workers. Temporary short term lane shifts will vbe needed during portions of this project. Contact: Robert Mutzi Phone: 765-772-3991 email: rob@jrkellyco.com

    More Details
  7. Lafayette Farmers Market-5th St., Main to Columbia & Main to Ferry on Saturdays 5am to 1:30pm 5/1/21 to 10/30/21

    May 1, 2021, 5:00 AM - October 30, 2021, 1:30 PM

    Downtown Lafayette Farmer's Market on 5th Street between Main Street and Columbia Street, and Main Street to Ferry Street on Saturdays from 5:00 AM to 1:30 PM. This will be 5/1/21 to 10/30/21. Contact: Rebecca Jones Phone: 765-742-4044 (office) 765-203-9393 (cell) email: rjones@greaterlafayettecommerce.com